Sheikh Zayed Bin Sultan Street – Package 1
Sheikh Zayed Bin Sultan Street, Abu Dhabi
Design and build of an outbound bridge ramp inside the Sheikh Zayed Tunnel, plus junction upgrades.
- Contract value
- AED 106M
- Start
- Jul 2016
- Completion
- Jun 2019
- Duration
- 36 months
- Status
- Completed
- Client
- Musanada
- Consultant
- De Leuw Cather International Ltd.
- Contractor
- Agility ECC
Scope of work
- Design and build of a bridge ramp for uninterrupted flow from the IP-36 portal to the tunnel exit
- Outbound bridge ramp built inside the existing tunnel between IP-36 and IP-44
- Surface improvements to junctions IP-36, IP-36B and IP-44
- Milling and overlay of outbound lanes between IP-36 and IP-SP
Gallery
Contract title
Completion of Development Works of Sheikh Zayed Bin Sultan Street from Al Falah Intersection to Sea Palace Intersection – (Package 1) Contract No. 1401
Related projects
Completed 2019–2023
Mina Zayed Tunnel
About 2.5 km of new road network with tunnels, a flyover and underpasses in Mina Zayed.
Musanada AED 1.65B
Completed Dec 2023
View project details
Completed 2023–2024
Khaleej Al Arabi Junction (IP-135)
Upgrade of the Khaleej Al Arabi junction with a new three-lane bridge and a two-lane ramp.
Department of Municipalities and Transport AED 245M
Completed Dec 2024
View project details
Photo: Abu Dhabi Media Office Completed 2020–2022
East–West Baniyas Interchange
Interchange linking East and West Baniyas, with movements in all directions to and from Abu Dhabi and Al Ain.
Department of Municipalities and Transport (Abu Dhabi City Municipality) AED 218M
Completed Nov 2022
View project details